Case Studies
Home > Company > Case Studies
Case Study 1
Streamlining Operations
Streamlining Operations
Case Study Details
Location: Bidadi, Bengaluru
Industry Type: Auto Manufacturing
Challenge: Timings And Production Shortfall
Challenge Before
System Implementation:
chit-chat, gossip, and loitering, resulting in lessened efficiency
Impact After
System Implementation:
Integration of network PA (Public Address) systems and digital network clocks with the company’s time and attendance system helped with ensuring punctuality and strict adherence to work schedules. Overall discipline was improved with regulated break times. In turn, this led to enhanced productivity and results, thus, elevating efficiency.
Case Study 2
Boosting Productivity
Boosting Productivity
Case Study Details
Location: Hoskote, Bengaluru
Industry Type: E-Commerce
Challenge: Packing delay
Challenge Before
System Implementation:
The team faced difficulties in ensuring smooth operations in the packing and validation processes. Several factors were hindering productivity such as returns, maintenance, packaging concerns, etc. All these issues required a lot of time to be clarified and resolved. Hence, the workflow was reduced, slowing down the overall productivity.
Impact After
System Implementation:
After the successful installation of a wireless Andon system, quick communication through audio signals, alerts, and visual indicators was used to alert team members about issues in real-time. This led to quicker resolution of issues improving the packing and validation process. The throughput was remarkably enhanced, inviting appreciation from the senior management. Owing to the success after implementation, plans of deploying the system across all lines nationwide (pan India) are underway to skyrocket productivity.
